Placement of Sculpture at Chandra Chowk facade The M.S.(mild steel) Platforms for placement of 38 Sculptures fixed in six bays at Chandra Chowk facade commenced in October 2016 and completed in April 2017 by Projects Team, MMCF. Restoration and renovation work of Palace Studio (Shop No. 19) at Tripolia The renovation and restoration work of Shop commenced in October 2016 and completed in April 17. The Palace studio was shifted from Shop No. 1 to 19. |
Restoration and renovation work of Textile Storage (Phase - 1) on Ground Floor of The Zenana Mahal The renovation and restoration work of Textile Storage located at ground floor at southern side of OSARA in The Zenana Mahal commenced in October 2016 and completed in April 2017. All stone pillars and other ornamental artefacts were restored with lime Jhinki, Ghutai and the wall surface was restored with lime plaster by local craftsmen. |
|||||||||
|